Confident cranking
A dedicated supercapacitor bank is intended to deliver the short burst of high current needed to turn the engine over.
High-performance, reliable engine starting
Strong cranking power. Energy for the next attempt. Confidence when it’s time to go. PulseStart is being developed to make dependable engine starting the priority—combining supercapacitor burst power with an LTO energy reserve in one managed system.
Concept in development · Not yet available for sale
THE BENEFITS WE’RE DEVELOPING FOR
A demanding start needs a burst of power. The next attempt needs energy in reserve. Giving each job a dedicated role is the thinking behind PulseStart—and our approach to more dependable starting.
These are design goals. Performance and reliability benefits are still to be validated through engineering and application testing.
A dedicated supercapacitor bank is intended to deliver the short burst of high current needed to turn the engine over.
The LTO energy reserve is intended to support recovery between starts, keeping repeated attempts central to the design.
A managed connection aims to limit unwanted energy transfer between the banks while parked, helping preserve reserve for the next start.
HOW IT WORKS
The analogy is simple: LTO cells are intended to provide the energy reserve; supercapacitors are intended to provide the short burst of power used during engine cranking. The engineering is more involved.
Current exploration considers six LTO cells in series and six series-connected 2.7 V supercapacitors. Discussed electrical values and component targets are preliminary design inputs—not measured product ratings.
Open work includes balancing, voltage management, pre-charge and inrush behaviour, contactor failure states, starter transients, alternator compatibility, standby draw, protection, thermal and mechanical design, diagnostics, service isolation, environmental durability, transport, and applicable standards.
DISCOVERY AREAS
These are questions, not approved applications. Tell us about your vehicle, environment, use pattern, and the problem worth solving.
ROLES, NOT RANKINGS
Concept specification — subject to testing and change. No technology comparison or application advantage is claimed.
DEVELOPMENT STATUS
The concept has progressed through early prototype exploration. Next comes defining target applications and validating the electrical, control, safety, compliance, manufacturing, service, and commercial requirements.
A QUICK QUESTION
Select all that apply. These choices will be included if you register below.
EXPRESSION OF INTEREST
Start with the essentials. Registration is non-binding, free, and is not a preorder, reservation, or promise of availability.
Your response goes to support@velec.com.au. No account or payment required.
STRAIGHT ANSWERS
No. It is an early-stage concept under engineering and market validation and is not currently offered for sale.
The proposed architecture separates energy storage and short-duration cranking support across LTO cells and supercapacitors, coordinated by a managed connection. Whether this produces a meaningful application-level advantage remains to be validated.
Compatibility has not been established. Charging system, voltage range, cranking demand, standby loads, climate, packaging, mounting, vehicle electronics, and applicable standards all matter.
No safety conclusion should be made at this stage. Any future product would require appropriate electrical, mechanical, thermal, abuse, fault, vehicle-integration, transport, and compliance assessment. High-current energy systems can cause fire, burns, arc flash, equipment damage, or injury if designed or handled incorrectly.
Not currently. You can register a non-binding expression of interest or volunteer for research updates. No payment is requested.
Responses will be analysed to identify priority applications. Some participants may later be invited to optional interviews or controlled testing, subject to eligibility and separate terms.
Pricing and availability have not been determined. Any ranges discussed in research are directional, not commitments.
AN OPEN INVITATION